|
2015, Vol. 52(4): 195-200 DOI: | ||
The Application of Multi-Beam Bathymetry-Based Riverbed Monitoring Technology in a Large-Diameter Shield Tunnel Project | ||
(1 CCCC Highway Consultants Co. Ltd., Beijing 100088;2 CCCC Nanjing Weisan Rd. River-Crossing Tunnel Construction Headquarters, Nanjing 211800) | ||
Received null Revised null | ||
Supporting info | ||
|