|
2015, Vol. 52(5): 10-15 DOI: | ||
Construction Difficulties and Countermeasures for the Lanzhou-Chongqing Railway Tunnels in Complicated Geological Conditions | ||
(China Railway First Survey & Design Institute Group Co. Ltd., Xi'an 710043) | ||
Received null Revised null | ||
Supporting info | ||
|