|
2015, Vol. 52(6): 177-183 DOI: | ||
The Operating Energy Efficiency of a Tunnel Heating System Using a Ground-Source Heat Pump in a Cold Region | ||
1. Hulunbuir Transportation Technology Management Station 2. Department of Geotechnical Engineering, Tongji University 3. Key Laboratory of Geotechnical and Underground Engineering, Tongji University | ||
Received null Revised null | ||
Supporting info | ||
|