|
2016, Vol. 53(2): 182-189 DOI: | ||
Research and Application of a Construction Scheme for a Bored Metro Tunnel Intersection in Shallow Fractured Surrounding Rock Based on the "Structure Priority" Principle | ||
(1 College of Civil and Architecture Engineering, Shandong University of Science and Technology, Qingdao 266590; 2 No.1 Engineering Company of China Railway 17Bureau Group Co. Ltd., Taiyuan 030032) | ||
Received null Revised null | ||
Supporting info | ||
|