现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2016, Vol. 53(2): 202-206    DOI:
Principles of the Shallow Bored Tunnel Method Applied to Chimney Collapse Treatment for a Tunnel in Western China
(Power China Huadong Engineering Corporation, Hangzhou 310014)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn