现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2016, Vol. 53(3): 1-7    DOI:
On a New Auxiliary Method of Shield Construction with Paste HDN
(1 Guangzhou Mass Transit Engineering Consultant Co. Ltd., Guangzhou 510010; 2 Guangzhou Metro Group Co. Ltd., Guangzhou 510330; 3 Sun Yat-Sen University, Guangzhou 510275; 4 Foshan Taidisi Materials Co. Ltd., Foshan 528200)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn