现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2016, Vol. 53(3): 98-104    DOI:
Research on the Relationship between Tunnel Segment Leakage and Large Slurry Shield Construction Parameters
(1 SHU-UTS SILC Business School, Shanghai University, Shanghai 201800; 2 SHU-SUCG Research Center for Building Industrialization, Shanghai University, Shanghai 200072; 3 Department of Civil Engineering, Shanghai University, Shanghai 200072)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn