|
2016, Vol. 53(3): 157-163 DOI: | ||
Scheme Optimization and Monitoring Analysis for the Exit Portal Section of an Urban Double-Arch Tunnel under a Retaining Wall | ||
(Xiamen Municipal Construction and Development Corporation, Xiamen 361000) | ||
Received null Revised null | ||
Supporting info | ||
|