现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2016, Vol. 53(3): 189-194    DOI:
Deformation Control by Anchoring Pile for a Tunnel Passing through a Debris Flow Fan
(The 1st Engineering Co. Ltd. of China Railway 25th Bureau Group, Guangzhou 510405)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn