现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2016, Vol. 53(3): 207-211    DOI:
Mechanism Analysis and Treatment Measures for Settlement and Cracking of the Primary Support Structure in a Red Clay Tunnel
(China Construction Fifth Engineering Division Corp. Ltd., Changsha 410004)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn