|
2016, Vol. 53(3): 207-211 DOI: | ||
Mechanism Analysis and Treatment Measures for Settlement and Cracking of the Primary Support Structure in a Red Clay Tunnel | ||
(China Construction Fifth Engineering Division Corp. Ltd., Changsha 410004) | ||
Received null Revised null | ||
Supporting info | ||
|