|
2016, Vol. 53(4): 134-142 DOI: | ||
Construction Technology for the Shield Tunnel Passing under the Existing Metro Line at the Launching End | ||
(1 Beijing Jiaotong University, Beijing 100001; 2 China Construction Communications Engineering Group Co. Ltd., Beijing 100083;3 Zhengzhou University, Zhengzhou 450001; 4 School of Mechanics and Construction Engineering, China University of Mining &Technology, Beijing 100083) | ||
Received null Revised null | ||
Supporting info | ||
|