|
2016, Vol. 53(4): 143-147 DOI: | ||
Formation and Treatment of the High-Pressure Water Inflow in the Extra-Long Feixianguan Tunnel | ||
(1 Sichuan Transportation Investment Group Co. Ltd., Chengdu 610041; 2 Sichuan Renmu Expressway Co. Ltd., Chengdu 610041) | ||
Received null Revised null | ||
Supporting info | ||
|