|
2016, Vol. 53(5): 183-187 DOI: | ||
Optimized Design for the Construction of a Double-Arch Tunnel with a Concealed Mid-Partition | ||
(1 China Railway Eryuan Engineering Group Co. Ltd., Chengdu 610031; 2 School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031) | ||
Received null Revised null | ||
Supporting info | ||
|