|
2017, Vol. 54(1): 9-16 DOI: | ||
On Some Issues with Concrete during Tunnelling by the Mechanical PreCutting Method | ||
(1 China Railway Siyuan Survey and Design Group Co. Ltd., Wuhan 430064; 2 School of Civil Engineering of Beijing Jiaotong University, Beijing 100044) | ||
Received null Revised null | ||
Supporting info | ||
|