|
2017, Vol. 54(1): 138-144 DOI: | ||
Numerical Study of Crack Development of Shield Tunnel Lining Segments | ||
(1 Shanxi Provincial Major Laboratory for Highway Bridge & Tunnel, Chang′an University, Xi′an 710064; 2 Zhengzhou Xinggang Investment & Development Group Co. Ltd, Zhengzhou 450016; 3 City Railway Branch, China CREC Railway Electrification Bureau Group, Xi′an 710061; 4 School of Highway, Chang′an University, Xi′an 710064) | ||
Received null Revised null | ||
Supporting info | ||
|