|
2017, Vol. 54(1): 180-185 DOI: | ||
Timely Grouting with Forms at the Crown of a Railway Tunnel Via a Lining Trolley | ||
(1 Engineering Management Center of China Railway, Beijing 100844; 2 China Railway Eleventh Bureau Group Company,Wuhan 430061) | ||
Received null Revised null | ||
Supporting info | ||
|