|
2017, Vol. 54(2): 1-8 DOI: | ||
Roles and Structures of Cold-Proof Drainage Tunnels for Different Permafrost Tunnels | ||
(1 Department of Geotechnical Engineering, Tongji University, Shanghai 200092; 2 China Railway Siyuan Survey and Design Group Co. Ltd., Wuhan 430063) | ||
Received null Revised null | ||
Supporting info | ||
|