|
2017, Vol. 54(2): 87-95 DOI: | ||
Calculation of Ground Settlements Induced by the Construction of Twin Parallel Shield Tunnels with Small Intervals Based on the Uniform Analytical Solution | ||
(1 Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015; 2 Institute of Geotechnical Engineering,Zhejiang University, Hangzhou 310058) | ||
Received null Revised null | ||
Supporting info | ||
|