|
2017, Vol. 54(2): 202-206 DOI: | ||
Raise Construction Techniques for Inclined Ventilation Shaft of the Long, Deep- Buried Erlangshan Tunnel | ||
(The 3th Engineering Co. Ltd. of China Railway 12th Bureau Group, Taiyuan 030024) | ||
Received null Revised null | ||
Supporting info | ||
|