|
2017, Vol. 54(2): 213-217 DOI: | ||
Key Construction Techniques for Waterproofing and Drainage of Large-Span Four-Track Railway Station Tunnels in a Soft Rock Mountain Area | ||
(Xi′an Engineering Consultancy & Supervision Co. Ltd., FSDI, Xi′an 710065) | ||
Received null Revised null | ||
Supporting info | ||
|