现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2017, Vol. 54(3): 50-57    DOI:
Dual-Stage Multi-Strategy PSO-BP Model for Tunnel Cavern Foundation Stability
(School of Civil Engineering, Liaoning University of Science and Technology,Anshan 114051)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn