现代隧道技术
Home
|
About Journal
|
Editorial Board
|
|
Instruction
|
Subscription
|
Advertisement
|
|
Download
|
中文
Office Online
Search
Adv Search
2017, Vol. 54(3): 50-57 DOI:
Dual-Stage Multi-Strategy PSO-BP Model for Tunnel Cavern Foundation Stability
(School of Civil Engineering, Liaoning University of Science and Technology,Anshan 114051)
Received
null
Revised
null
Supporting info
Copyright © 2011 Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:
Beijing Magtech Co.ltd
Email:
support@magtech.com.cn