|
2017, Vol. 54(3): 126-134 DOI: | ||
Numerical Analysis of the Influence of a Cavity behind the Shield Lining on the Tunnel Structure | ||
(1 Shanxi Provincial Major Laboratory for Highway Bridge & Tunnel, Chang′an University, Xi′an 710064; 2 Zhengzhou Xinggang Investment & Development Group Co. Ltd., Zhengzhou 450016; 3 Geophysical Test Center, China Railway First Group Co. Ltd., Xi′an 710055) | ||
Received null Revised null | ||
Supporting info | ||
|