|
2017, Vol. 54(3): 200-203 DOI: | ||
Water Pressure Monitoring Method for the Segment Structure of a Deep-Water Shield Tunnel | ||
(1 Guangdong Research Institute of Water Resources and Hydropower, Guangzhou 510610; 2 Guangdong Water Supply Project Management Bureau, Guangzhou 510610) | ||
Received null Revised null | ||
Supporting info | ||
|