|
2017, Vol. 54(4): 41-47 DOI: | ||
Risk Evaluation System for the Impacts of a Concealed Karst Cave on Tunnel Construction | ||
(1 Key Laboratory of Geotechnical and Underground Engineering of the Ministry of Education, Tongji University, Shanghai 200092;2 Department of Geotechnical Engineering College of Civil Engineering Tongji University, Shanghai 200092; 3 CCCC Rail Transit Consultants Co. Ltd., Wuhan 430056; 4 Anhui Comprehensive Transportation Research Institute Co. Ltd., Hefei 230000) | ||
Received null Revised null | ||
Supporting info | ||
|