|
2017, Vol. 54(4): 173-179 DOI: | ||
Ventilation with a Parallel Adit in a Super-Long Expressway Tunnel with a Large Overburden | ||
(1 Survey, Design and Research Institute of China Railway Tunnel Group Co. Ltd., Guangzhou 511458; 2 Hunan Provincial Communications Planning, Survey & Design Institute, Changsha 410008) | ||
Received null Revised null | ||
Supporting info | ||
|