|
2017, Vol. 54(4): 207-212 DOI: | ||
Application of a Comprehensive Geological Prediction System to Construction of the New Tongluoshan Tunnel | ||
(Survey and Design Company of Sichuan Road & Bridge Group Co. Ltd., Chengdu 610041) | ||
Received null Revised null | ||
Supporting info | ||
null | ||
|