|
2017, Vol. 54(5): 13-17 DOI: | ||
Suggestions for Revision of Some Clauses of Structure Calculations in the“JTG D70-2004 Code for Design of Road Tunnels | ||
(1 Sichuan Provincial Transport Department Highway Planning Survey, Design And Research Institute, Chengdu 610041; 2 Guangxi Guidong Expressway Co., Ltd., Nanning 533000; 3 MOE Key Laboratory of Transportation Tunnel Engineering, Southwest Jiaotong University, Chengdu 610031) | ||
Received null Revised null | ||
Supporting info | ||
|