|
2017, Vol. 54(5): 18-23 DOI: | ||
Challenges during Construction of Railway Gas Tunnels—Case Study of Gas Burst in the Tianping Tunnel | ||
(No. 1 Department Co. Ltd., China Railway Tunnel Group, Chongqing 401123) | ||
Received null Revised null | ||
Supporting info | ||
|