|
2017, Vol. 54(5): 209-216 DOI: | ||
Optimization and Application of the Shallow-Buried Construction Method for an Urban Underground Road Tunnel | ||
(School of Civil Engineering, Central South University, Changsha 410075) | ||
Received null Revised null | ||
Supporting info | ||
|