|
2017, Vol. 54(6): 117-125 DOI: | ||
Analysis of Ground Settlement Induced by Shield Tunnel Construction in a Soft Layer | ||
(1 College of Civil Engineering and Architecture, Guangxi University, Nanning 530004; 2 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3 Shenzhen Municipal Design & Research Institute Co. Ltd., Shenzhen 518029) | ||
Received null Revised null | ||
Supporting info | ||
|