|
2017, Vol. 54(6): 203-209 DOI: | ||
Rapid Construction Technique for a Large Upper-Section of the Tianping Tunnel in Soft Rocks | ||
(The First Construction Institution of China Railway Tunnel Group, Chongqing 401121) | ||
Received null Revised null | ||
Supporting info | ||
|