|
2017, Vol. 54(6): 217-222 DOI: | ||
Clay Cake Prevention for a Slurry Shield Cutterhead in Argillaceous Siltstone Stratum | ||
(1 China Railway Tunnel Group Co. Ltd., Luoyang 471000; 2 State Key Laboratory of Shield Machine and Boring Technology,Zhengzhou 450001) | ||
Received null Revised null | ||
Supporting info | ||
|