|
2018, Vol. 55(1): 85-91 DOI: | ||
Back Analysis of the Internal Force on the Supporting Structure of a Multi-Centered Circular Arch Tunnel | ||
(1 China Railway Group Limited, Beijing 100039; 2 China Railway Construction Investment Group Corporation Limited, Beijing 100055; 3 China Railway First Group Co. Ltd., Xi′an 710054) | ||
Received null Revised null | ||
Supporting info | ||
|