|
2018, Vol. 55(1): 148-155 DOI: | ||
Calculation Model of the Uplift Movement of a Shield Tunnel during Construction in Soft Soil | ||
(1 Department of Civil Engineering, Hebei Jiaotong Vocational and Technical College, Shijiazhuang 050091; 2 School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043; 3 School of Civil Engineering, Southwest Jiaotong University,Chengdu 610031) | ||
Received null Revised null | ||
Supporting info | ||
|