|
2018, Vol. 55(1): 178-183 DOI: | ||
A Calculation method of slurry volume-weight during trenching construction of a diaphragm wall based on the stability of slot wall | ||
(1 China Railway Construction Investment Group Corporation Limited, Beijing 100055; 2 School of Civil Engineering, Central South University, Changsha 410075) | ||
Received null Revised null | ||
Supporting info | ||
|