|
2018, Vol. 55(1): 194-202 DOI: | ||
Structure Deformation Caused by Shield Tunnel Excavation Above Existing Tunnels of Shenzhen Metro | ||
(1 School of Mechanics and Civil Engineering, China University of Mining and Technology, Beijing 100083; 2 China Construction Communications Engrg. Group Corp. Ltd., Beijing 100161) | ||
Received null Revised null | ||
Supporting info | ||
|