现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2018, Vol. 55(2): 189-193    DOI:
On Surface Settlement during Subway Station Construction Using the Center Drift Excavation Method
(Beijing Urban Construction Exploration & Surveying Design Research Institute Co. Ltd., Beijing 100101)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn