|
2018, Vol. 55(2): 180-188 DOI: | ||
On Configuration and Optimization of Cutting Tools for the Supper-Large Shield Passing through the Upper-Soft and Lower-Hard Stratum | ||
(1 Management Department of Qingdao Rail Transit Line R3 Project of CCCC, Qingdao 266500; 2 CCCC First Highway Engineering Co., Ltd., Beijing 000021) | ||
Received null Revised null | ||
Supporting info | ||
|