|
2018, Vol. 55(3): 6-9 DOI: | ||
Application of Chinese Characters in the Design and Construction of the Badaling Great Wall Station of the Beijing-Zhangjiakou High-Speed Railway | ||
(1 Project Management Center of China Railway, Beijing 100844; 2 China Railway Engineering Consulting Group Co. Ltd., Beijing 100055; 3 China Railway No. 5 Engineering Group Co. Ltd., Changsha 410117) | ||
Received null Revised null | ||
Supporting info | ||
|