|
| 2018, Vol. 55(4): 53-58 DOI: | ||
| BIM Techniques for Construction Management of the Qinghuayuan Tunnel on the Beijing-Zhangjiakou High-Speed Railway | ||
| (China Academy of Railway Sciences Corporation Limited, Beijing 100081) | ||
| Received null Revised null | ||
| Supporting info | ||
|