现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2018, Vol. 55(4): 76-86    DOI:
Initial Geo-Stress Balance Method for the Finite-Element Model Using the Stratum-Structure Method
(Civil Engineering College of Xi′an University of Architecture and Technology, Xi′an 710055)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn