|
2018, Vol. 55(4): 178-185 DOI: | ||
Fast Entrance Excavation Method and Stability Control Techniques for a Shallow Tunnel with Uneven Rock Pressure and a Weak Rock Mass | ||
(1 Department of Civil Engineering, Hebei Jiaotong Vocational and Technical College, Shijiazhuang 050091; 2 School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043; 3 Hebei Provincial Expressway Shi-An Management Department, Shijiazhuang 050000; 4 CSCEC Road and Bridge Group Co. Ltd., Shijiazhuang 050001) |
||
Received null Revised null | ||
Supporting info | ||
|