|
2018, Vol. 55(6): 152-162 DOI: | ||
Full-scale Test on Ultimate Bearing Capacity of Tunnel Segment Lining with Staggered Joints | ||
(1 Ningbo University,Ningbo 315211; 2 Department of Geotechnical Engineering, Tongji University, Shanghai 200092;3 Construction Headquarters of Ningbo Rail Transit, Ningbo 310006) | ||
Received null Revised null | ||
Supporting info | ||
|