现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2018, Vol. 55(6): 163-169    DOI:
Model Test on Mechanism of Shear Resistance Borne by Concrete Shear Key and Friction of Element Joint of the Immersed Tunnel
(1 Key Laboratory of Large-span Bridge Construction Technology, Ministry of Communications, Wuhan 430040 ; 2 CCCC Second Harbor Engineering Co., Ltd., Wuhan 430014)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn