|
2018, Vol. 55(6): 210-216 DOI: | ||
A Study of Prevention Techniques for Tunnel Lining Defects | ||
(1 Beijing-Shenyang PDL Jingji Section Limited Company, Beijing 101500; 2 China Railway 22nd Bureau Group Corporation, Beijing 100043) | ||
Received null Revised null | ||
Supporting info | ||
|