|
2019, Vol. 56(1): 27-32 DOI: | ||
Study on Water Inflow and Burst in the Hydraulic Tunnel of Hydropower Projects in Southwest China | ||
(1 State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059;2 Chengdu Engineering Corporation Limited of Power China, Chengdu 610072) | ||
Received null Revised null | ||
Supporting info | ||
|