|
2019, Vol. 56(1): 33-38 DOI: | ||
Analysis of Treatment Methods for the Foundation of the Immersed Tunnel | ||
(1 State Key Laboratory of Hydraulic Engineering Simulation and safety, Tianjin University, Tianjin 300072;2 School of Civil Engineering, Tianjin University, Tianjin 300072;3 No.2 Engineering Company, Ltd., of CCCC First Harbor Engineering Company Ltd.,Qingdao 266071 | ||
Received null Revised null | ||
Supporting info | ||
|