|
2019, Vol. 56(1): 176-184 DOI: | ||
Study on Construction Method of the Intersection of the Urban Underground Interchange Tunnel | ||
(1 Powerchina Huadong Engineering Corporation Limited, Hangzhou 311122; 2 Zhengjiang Engineering Research Center of Smart Rail Transportation, Hangzhou 311225; 3 State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology, Chengdu 610059) | ||
Received null Revised null | ||
Supporting info | ||
|