|
2019, Vol. 56(1): 192-199 DOI: | ||
Study on Disease Causes and Rehabilitation Schemes for the Taoping Tunnel on Houma-Yueshan Railway | ||
(China Railway First Survey & Design Institute Group Co., Ltd., Xi′an 710043) | ||
Received null Revised null | ||
Supporting info | ||
|