|
2019, Vol. 56(2): 10-17 DOI: | ||
Study on Key Techniques for TBM1 Section of the Water Conveyance Tunnel of Lanzhou Water Source Construction Project | ||
(1 Yellow River Engineering Consulting Co., Ltd, Zhengzhou, 450003; 2 Sinohydro Engineering Bureau 4 Co., Ltd., Xi′ning 810007) | ||
Received null Revised null | ||
Supporting info | ||
|